From a bare room to a complete bathroom: waterproofed, finished with large wall and floor tiles, a linear drain, glass walk-in shower, rain shower, toilet and small washbasin.
Before & after
BeforeAfter
Bathroom before and after: from bare room to complete bathroom
Step by step
1
Step 1: Preparation and waterproofing
The walls were prepared and the corners and joints were waterproofed.
2
Step 2: Wall tiling
Large wall tiles are fitted using a levelling system for a smooth, even result.
3
Step 3: Floor tiles and linear drain
The floor is tiled and the linear shower drain is built in.
4
Step 4: Glass shower panel
The glass walk-in shower panel has been installed.
5
Step 5: Result
A complete, modern bathroom with rain shower, toilet and small washbasin.
Have a job in mind?
Get in touch with no obligation. We're happy to think along with you.